TOPPER IAS
Login Talk to a mentor

← 29 October 2026's Current Affairs · Economy GA Prelims ★★★★☆ Mains ★★★☆☆

PM to open Bharat Renewable Energy Summit and Expo on 2 November; India needs $220 billion for green power by FY30

29 October 2026 · ⏱ 2 நிமிடம் · GS3: Energy; infrastructure

1

ஏன் செய்தியில்?

$220 billion by FY30: the 500 GW non-fossil target every GS3 Energy answer must cite

PM to open the renewable energy expo on 2 November; $220 billion needed for green power by FY30.

Why it matters: factual, Prelims-type

2

What you need to know

2 நிமிடம்

The Prime Minister will inaugurate the Bharat Renewable Energy Summit and Expo 2026 on 2 November.

At the curtain-raiser it was said that India needs about $220 billion for its green power transition by FY30.

India's declared goal is 500 GW of non-fossil power capacity by 2030.

ஆதாரங்கள்: Topper IAS editorial (PIB / The Hindu / Indian Express)

3

முக்கிய உண்மைகள்

Remember these

  • The Prime Minister will inaugurate the Bharat Renewable Energy Summit and Expo 2026 on 2 November.
  • India needs about $220 billion for its green power transition by FY30.
  • India's declared goal is 500 GW of non-fossil power capacity by 2030.
  • The 500 GW target was announced at COP26, Glasgow (2021) as part of India's 'Panchamrit' commitments.
  • India has also committed to net-zero emissions by 2070.
4

ப்ரிலிம்ஸ் · மெயின்ஸ்

How the exam will ask it

ப்ரிலிம்ஸ்

  • India's target is 500 GW of non-fossil fuel based installed electricity capacity by 2030, which includes solar, wind, hydro and nuclear, not only solar and wind.
  • The 500 GW target and net-zero by 2070 were announced by India at COP26 in Glasgow as part of the 'Panchamrit' commitments.
  • The Ministry of New and Renewable Energy (MNRE) is the nodal ministry for renewable energy policy and programmes in India.

மெயின்ஸ்

GS3 (Energy, Infrastructure, Environment): India's 500 GW non-fossil target by 2030 requires an estimated $220 billion for the green power transition by FY30. Key issues are financing and cost of capital, transmission and grid integration, storage for intermittency, land and supply-chain dependence, and DISCOM health; policy responses include the PLI scheme for solar modules, green energy corridors and open access. The way forward lies in cheaper long-term finance, storage and grid upgrades, domestic manufacturing and a just transition for coal-dependent regions.

5

Quick recall

Answer before you reveal

Under Project Cheetah, the first batch of cheetahs was brought to Kuno National Park in September 2022 from which country?

  1. Namibia
  2. South Africa
  3. Botswana
  4. Kenya
விடையைக் காட்டு

விடை: A — The correct answer is Namibia. The first batch of cheetahs came from Namibia in September 2022.

6

Convert this topic into marks

Today's 10-MCQ test · instant analysis · Powered by AdaptIQ

DONE READING?

Test today's current affairs.