TOPPER IAS
Login Talk to a mentor

← 10 October 2026's Current Affairs · Karnataka KPSC Prelims ★★★☆☆ Mains ★★☆☆☆

Karnataka wins award for highest under-construction wind power capacity of 9 GW

10 October 2026 · ⏱ 2 মিনিট · GS3 Energy: Renewables; Karnataka economy

1

খবরে কেন?

9 GW of wind under construction: why Karnataka leads, and the renewable-energy facts GS3 expects

Karnataka is recognised for the largest wind capacity under construction.

Why it matters: Karnataka-specific

Karnataka wins award for highest under-construction wind power capacity of 9 GW
Pratik Mudalgi · CC BY-SA 4.0 · Wikimedia Commons
2

What you need to know

2 মিনিট

Karnataka has won an award for having the highest under-construction wind power capacity in the country, at 9 GW.

The recognition underlines the State's growing role in renewable energy.

সূত্র: Topper IAS editorial (PIB / The Hindu / Indian Express)

3

মূল তথ্য

Remember these

  • Karnataka has the highest under-construction wind power capacity in India: 9 GW
  • Wind energy falls under the Ministry of New and Renewable Energy (MNRE)
  • The National Institute of Wind Energy (NIWE), Chennai, is the MNRE's technical body for wind resource assessment
  • India's wind-solar hybrid policy was issued in 2018 to optimise land and grid use
  • India's target is 500 GW of non-fossil capacity by 2030
4

প্রিলিমস · মেইনস

How the exam will ask it

প্রিলিমস

  • Statement: Wind energy comes under the Ministry of New and Renewable Energy. (Correct)
  • Statement: The National Institute of Wind Energy is headquartered in Chennai and assesses wind potential. (Correct)
  • Statement: Wind power is a non-conventional, renewable source because it does not deplete the resource used. (Correct)

মেইনস

GS3 (Energy, Infrastructure) and Karnataka economy. Karnataka's 9 GW wind pipeline shows the State's growing role in India's clean-energy transition, but evacuation infrastructure, land acquisition, grid stability and intermittency remain constraints. Transmission planning, wind-solar hybrid projects, storage and timely discom payments are the way forward.

5

Quick recall

Answer before you reveal

    উত্তর দেখুন

    উত্তর: —

    6

    Convert this topic into marks

    Today's 10-MCQ test · instant analysis · Powered by AdaptIQ

    DONE READING?

    Test today's current affairs.